Autumn Work day

dry-shelter-2-23-10-16
bridget-3-23-10-16

It is amazing what can be achieved in one day – thank you to all who came to help at the campsite for the Autumn work day. In addition to the usual tasks required to close the site for the winter, the outside of the Blue Cap/Barcheston dry shelter had a brush down and repaint, and is looking fantastic!